Briggs & Stratton Standby Generator Systems Betreibershandbuch Seite 37

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 44
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 36
37
Antenna Installation
The supplied antenna must be installed before the wireless
monitor will operate.
1. Insert key into lock of front panel. Gently push down
on roof above the lock to aid in turning the key. Turn
key one quarter turn clockwise.
2. Lift roof to the open position.
3. Carefully push out the plug (A) located on the inside of
the roof.
4. Unscrew flange nut (B) from antenna post and
remove from antenna wire.
5. Route antenna wire (D) from the top side of the roof,
through the hole in the roof where the plug was
removed.
6. Replace flange nut on wire. Ensure the wire is routed
through the washer end.
7. Secure antenna to roof with the flange nut.
8. Locate wire connector (C) coming from control panel
and connect to the wire coming from antenna.
9. Route wire and secure with supplied cable ties (E) .
10. Close and open the roof to ensure the antenna wire
experiences no chaffing or pulling.
A
B
D
E
E
C
A
B
D
C
E
NOT
for
REPRODUCTION
Seitenansicht 36
1 2 ... 32 33 34 35 36 37 38 39 40 41 42 43 44

Kommentare zu diesen Handbüchern

Keine Kommentare